Please enter your location, or select our default site experience.
There are # nearby branches to serve you.
Select your preferred branch below, or search again for another location.
Please wait while you are redirected...
In an effort to better serve our customers, this content is designed to be tailored to our individual service regions. Please select a branch to view updates in your area.
Please enter your location, or select our default site experience.
Searching... Please enter a location! Sorry, there are no results found near this location. Please try again.

Our default site experience provides general information and content for every region served.

Tech Tip: Pulling a Proper Vacuum

Save Yourself Time at the Job Site

Pulling a proper vacuum is essential to making sure the life of the equipment meets its full potential.  With today’s technology, we also accomplish this at a faster rate with large diameter, vacuum rated hoses and a well-maintained quality vacuum pump.

Here are four things you can do to make sure you are giving your customers the best install possible:

  1. Remove the valve cores using a vacuum rated valve core removal tool.
    • Yellow Jacket Part Number: R18975
    • JB Industries Part Number: JA32008
  2. Use a vacuum rated, large diameter hose.
    • Yellow Jacket Part Number: RIT16248
    • JB Industries Part Number: JCL6460 – or – JVL100
      (Includes Hose and Valve Core Removal Tool)
  3. Use a high quality, two-stage pump, connected directly to the system.
    • Yellow Jacket Part Number: RIT93600
    • JB Industries Part Number: JDV200N
    • Fieldpiece Part Number: FVP85
  4. Use a digital micron gauge and place it the furthermost point away from the pump.
    • Yellow Jacket Part Number: R69020
    • JB Industries Part Number: JDV22N

Issues within the refrigeration circuit can be avoided with the correct install steps, including a good vacuum.  Your goal should be to keep the closed refrigeration circuit clean, dry, and tight.  Let Ferguson help you – contact your local Ferguson sales representative for more information or with any questions.

Remember these good practices while assembling the field connections and doing repairs:

  • Keep tubing sealed with original plugs/caps, or tape if needed, prior to assembly.
  • Confirm fittings and refrigerant circuit components are clean and free of debris.
  • Eliminate contaminants from the tubing by cleaning before cutting.
  • Ream in such a way that shavings won’t fall into the lines.
  • Protect open pipework so that no rainwater or condensation can enter the lines.
  • Install and/or replace filter/driers as appropriate.
  • Purge with nitrogen before and after fitting and brazing the tubing.
  • Flow nitrogen while brazing to prevent a buildup of cupric oxide (nasty black flakes) inside the copper tubing.
  • Inspect joints all the way around with a mirror.
  • Perform a standing pressure test with high-pressure nitrogen, according to manufacturer recommendations.